The City Of Duluth is planning an Aerial Lift Bridge deck replacement in January and in preparation for that project, they will doing an assessment on Tuesday, October 17 that will result in single lane two-way traffic for the day.

The single lane restriction on Tuesday is expected to last from 9:30 a.m. to 3:30 p.m.  The City suggesting that motorists be mindful of the traffic signal, drive slowly and watch for the possible presence of flaggers.

Motorists should also plan additional travel time as there will be delays. The Aerial Lift Bridge may also lift for marine traffic, if requested.

More From Sasquatch 92.1 FM