This East Superior Street construction project is essentially a reconditioning that is primarily intended to preserve the life of the existing roadway.
If you're heading down into Canal Park this week, be prepared for possible delays near the Aerial Lift Bridge as scheduled maintenance work begins on Monday.
If you're spending time on Park Point, be extra careful between the shipping canal on the lakeside to 13th Street South as pieces of shredded aluminum cans have been found.
The City of Duluth will be hosting a series of virtual public listening sessions/workshops to cover different aspects of the Enger Redevelopment Project.